What wind mitigation inspections document on your roof

Your roof covering is only part of a wind mitigation inspection. We explain the hidden connections, roof shape and supporting records an inspector needs to document what your home actually has.

Inspector photographs a barrel tile hip roof and adjoining low-slope section on a stucco home.

Start with records, not assumptions

A wind mitigation inspection documents construction features that help a home resist wind damage. Florida's OIR-B1-1802 form includes roof covering, deck attachment, roof-to-wall connections, roof geometry and secondary water resistance. A roof can look sound from the driveway while important details remain hidden beneath it.

This is different from checking for cracked tiles, loose flashing or active leaks. A roof condition inspection identifies maintenance and repair needs. A wind mitigation inspection records specific features and the evidence supporting them. Neither report should be treated as a substitute for the other.

Before scheduling, ask your insurance agent which inspection documentation your insurer needs. Arrange for a qualified wind mitigation inspector to complete and certify the form. Our roof inspection photos and roofing project records can help support that process, but they do not replace the completed mitigation report.

Gather your roof permit records, final inspection record, roofing contract, product paperwork, installation photos and any previous mitigation report. Keep the records together by property address. If something is missing, check with your building department rather than guessing from the roof's appearance.

Roof covering and its permit history

The inspector identifies the covering on each roof area, such as concrete tile, clay tile, metal, architectural shingle or a flat roofing membrane. Supporting records help establish when it was installed and which product approval applied. A contractor's invoice can be useful background, but it may not establish every detail the inspector needs.

We often see homes with a tile main roof and a flat roof over an addition. Those areas may have different installation histories. Give the inspector records for both, and identify whether past work was a repair or a complete replacement.

Ask your building department for the permit application and available inspection records. Ask your roofer for the installed product information and project photos. Make sure the paperwork describes the roof actually present, not a proposed material that changed before installation.

If you are planning a re-roof, our guide to scheduling your South Florida roof replacement can help you organize the work. Include documentation in that planning, before the existing roof is removed.

How the roof deck attaches to the framing

The roof deck is the surface beneath the roofing system. On many homes, it consists of wood panels attached to rafters or trusses. The inspector looks at how that deck is fastened, including the fastener type and spacing. Other homes have different deck construction, such as reinforced concrete.

This attachment is separate from how tiles, shingles or metal panels attach above it. Changing the visible covering does not, by itself, document the fastening beneath it. The inspector needs evidence of the deck attachment and considers the weakest qualifying attachment present.

Tell the inspector where the attic access is and clear the area beneath it. Do not enter an unfinished attic or disturb insulation to prepare. Let the inspector determine what can be reached and verified safely.

During a roof replacement, ask us to photograph deck fastening work before underlayment covers it. Keep those photos with the permit and inspection records. Ask the mitigation inspector what supporting evidence is needed, because a distant progress photo may not show enough detail.

Inspector's hands photograph an exposed metal strap connecting roof framing to the wall.
An exposed roof-to-wall connector is photographed before roofing work conceals the connection.

Where the roof framing connects to the walls

The next connection is between the roof framing and the walls supporting it. Terms on the form include toe nails, clips, single wraps and double wraps. Toe nails enter the framing at an angle. Clips and wraps are metal connectors, with wraps extending over the framing member.

The presence of metal alone does not establish a classification. Installation, fastening, condition and the connection arrangement matter. A connector photographed from the wrong side may hide the detail the inspector needs to see.

Provide any records of connection upgrades and tell the inspector about additions or different attic areas. Do not assume a visible strap near the access hatch represents the entire roof. The form considers the weakest applicable connection, subject to its inspection criteria.

If connections are exposed during roofing work, request clear close-up photos and wider views showing their location. Keep installation paperwork with them. Have the qualified inspector determine how the documented connections fit the form rather than labeling them yourself.

Roof shape, slope and water resistance

A hip roof slopes down toward the exterior walls on all sides. A gable roof has a peaked end wall. Mixed shapes, additions and intersecting roof sections can affect the geometry classification. The inspector evaluates the actual layout rather than choosing a category from the home's architectural style.

The form also records roof slope and the property's wind region. Provide available roof plans and confirm the property address. Leave measurements and classification to the inspector, especially where the main roof and additions differ.

Secondary water resistance concerns a supplemental layer intended to limit water entry if the covering is lost. The form also calls this a sealed roof deck. Not every underlayment installation qualifies, and a description such as 'premium underlayment' does not establish what was installed.

Ask your roofer for the exact underlayment product, installation method and photos taken before the covering went on. Depending on the assembly, relevant evidence may show an adhered membrane, treated deck seams or another qualifying installation. The inspector needs to evaluate the assembly, not just the material name.

On tile roofs, this layer is concealed beneath the tile. Do not lift tiles or peel back roofing to investigate. Gather the records first and let the inspector explain any verification limits. For skylights, keep product approval and installation records available because they are roof openings considered elsewhere on the form.

Keep the report and ask your agent

Before the visit, use this short preparation list:

  • Collect records for every roof section, including additions.
  • Provide previous reports without assuming their findings still apply.
  • Clear access areas and identify recent roofing changes.
  • Ask which missing documents could help verify concealed features.
  • Keep the completed report, supporting photos and records together.

An unknown finding means the feature could not be established from the available evidence. It is not automatically a repair recommendation. Ask what remains unverified before deciding whether additional investigation or roofing work makes sense.

Wind mitigation features may qualify for insurance discounts. Ask your insurance agent how the documented features affect your policy and whether anything else is needed. We can discuss roof conditions and roofing records, but we do not determine your insurer's decision.

Start with a free roof inspection to discuss your roof's condition and available roofing records. Call (866) 601-1260.

Book a free inspection(866) 601-1260

Not sure what your roof needs?

Book a free roof inspection and we’ll show you, with photos. We answer the phone.